{"id":2911,"date":"2026-10-31T21:36:39","date_gmt":"2026-10-31T21:36:39","guid":{"rendered":"https:\/\/raynovtechnology.com\/test-bench-qualification-fat-sat\/"},"modified":"2026-11-01T10:29:46","modified_gmt":"2026-11-01T10:29:46","slug":"test-bench-qualification-fat-sat","status":"publish","type":"post","link":"https:\/\/raynovtechnology.com\/fr\/test-bench-qualification-fat-sat\/","title":{"rendered":"Qualifier un banc de test avant la production (FAT\/SAT)"},"content":{"rendered":"<p>A new end-of-line bench rejects one unit in ten on its first week. Production stops, the product team reworks parts, and two days later someone finds two channels swapped in the bench&#8217;s own harness. Every rejected unit was good. A test bench is a measuring instrument: until it has been proven, its PASS and FAIL mean nothing.<\/p>\n<p>This guide explains how to qualify a bench before it judges real products: what to check at the builder&#8217;s site (FAT), what to repeat on the customer&#8217;s site (SAT), and what documents should close the process.<\/p>\n<h2>1. Why a bench must be qualified<\/h2>\n<p>A bench combines instruments, a harness, fixtures, conditioning electronics and software. Each can introduce an error:<\/p>\n<ul>\n<li>a miswired channel in the bench harness;<\/li>\n<li>an instrument out of calibration;<\/li>\n<li>a limit typed wrongly in the limits file;<\/li>\n<li>a fixture contact that wears or does not seat properly;<\/li>\n<li>software that reports PASS when an instrument did not answer.<\/li>\n<\/ul>\n<p>Qualification answers one question with evidence: <strong>does this bench give the right verdict on known parts, repeatedly, in its real environment?<\/strong><\/p>\n<h2>2. The sequence: design review, FAT, SAT<\/h2>\n<p>Our own process runs from specification, architecture and design review to manufacturing, FAT, then delivery with SAT and training, and finally maintenance. The steps below follow that order.<\/p>\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1200\" height=\"630\" src=\"https:\/\/raynovtechnology.com\/wp-content\/uploads\/2026\/10\/raynov-fat-sat-qualification-flow.png\" alt=\"Test bench qualification flow: design qualification, FAT at the builder, SAT on site, then signed acceptance report\" class=\"wp-image-2933\" title=\"Qualifying a test bench before production (FAT\/SAT)\" srcset=\"https:\/\/raynovtechnology.com\/wp-content\/uploads\/2026\/10\/raynov-fat-sat-qualification-flow.png 1200w, https:\/\/raynovtechnology.com\/wp-content\/uploads\/2026\/10\/raynov-fat-sat-qualification-flow-300x158.png 300w, https:\/\/raynovtechnology.com\/wp-content\/uploads\/2026\/10\/raynov-fat-sat-qualification-flow-1024x538.png 1024w, https:\/\/raynovtechnology.com\/wp-content\/uploads\/2026\/10\/raynov-fat-sat-qualification-flow-768x403.png 768w, https:\/\/raynovtechnology.com\/wp-content\/uploads\/2026\/10\/raynov-fat-sat-qualification-flow-18x9.png 18w\" sizes=\"auto, (max-width: 1200px) 100vw, 1200px\" \/><figcaption class=\"wp-element-caption\">Test bench qualification sequence: design qualification, FAT at the builder, SAT on site, closed by a signed acceptance report.<\/figcaption><\/figure>\n<h3>2.1 Before FAT: the test specification of the bench<\/h3>\n<p>Qualification starts on paper. Before building, agree with the customer:<\/p>\n<ul>\n<li>the list of tests the bench must perform, with limits and units;<\/li>\n<li>the required measurement capability (resolution, tolerance to verify);<\/li>\n<li>the acceptance criteria for the bench itself;<\/li>\n<li>the FAT and SAT procedures: who does what, with which reference parts, and what counts as passed.<\/li>\n<\/ul>\n<p>Without written criteria, FAT becomes a demonstration instead of a test.<\/p>\n<h3>2.2 FAT: Factory Acceptance Test, at the builder<\/h3>\n<p>FAT takes place at the bench builder&#8217;s site, before shipping. The customer attends or receives the evidence. Typical content:<\/p>\n<ol>\n<li>Visual and mechanical inspection against the drawings.<\/li>\n<li>Electrical safety checks defined in the specification, typically: protective earth continuity of the cabinet and accessible metal parts, insulation resistance of mains circuits, a dielectric (hipot) test where applicable, emergency-stop and interlock function. These tests are performed by qualified staff with suitable equipment, and the applicable standard is stated in the specification.<\/li>\n<li>Channel verification (section 3).<\/li>\n<li>Instrument identity and calibration status (section 4).<\/li>\n<li>Execution of the full test sequence on reference units (section 5).<\/li>\n<li>Error-handling tests: disconnect an instrument, abort a run, check the bench reaches a safe state.<\/li>\n<li>Review of documentation (section 6).<\/li>\n<\/ol>\n<p>Every deviation is recorded, corrected and re-tested before shipping.<\/p>\n<h3>2.3 SAT: Site Acceptance Test, on site<\/h3>\n<p>SAT repeats the key checks once the bench is installed in its real environment: local mains, the production network, the real operators and often the real products. Transport can loosen connections; the site may have different grounding or noise. SAT typically includes:<\/p>\n<ul>\n<li>re-check of channels and instruments after transport;<\/li>\n<li>full sequence on reference units, on site;<\/li>\n<li>runs by the customer&#8217;s operators after training;<\/li>\n<li>confirmation that results are stored where production needs them.<\/li>\n<\/ul>\n<p>SAT ends with a signed acceptance report. From that point the bench can be used to judge products.<\/p>\n<h2>3. Channel verification<\/h2>\n<h3>3.1 Pinout and continuity of the bench harness<\/h3>\n<p>Every channel from the instrument terminal to the contact touching the product must be verified against the wiring list:<\/p>\n<ul>\n<li>continuity point to point;<\/li>\n<li>no short between adjacent channels;<\/li>\n<li>correct assignment: channel 12 in software really is pin 12 on the fixture.<\/li>\n<\/ul>\n<p>A practical method is a <strong>verification adapter<\/strong>: a dummy connector that loops or loads each pin in a known pattern, so the bench can check its own wiring automatically.<\/p>\n<h3>3.2 Worked example: harness resistance in a 4-wire versus 2-wire measurement<\/h3>\n<p><em>Example, illustrative values.<\/em> The bench measures a 1.00 \u03a9 shunt in the product. The bench harness adds 2 \u00d7 0.15 \u03a9 of wire and contact resistance.<\/p>\n<ul>\n<li>2-wire measurement: 1.00 + 0.30 = 1.30 \u03a9, a 30 % error.<\/li>\n<li>4-wire (Kelvin) measurement: the sense wires carry almost no current, so the reading stays close to 1.00 \u03a9.<\/li>\n<\/ul>\n<p>FAT should include at least one low-resistance reference to prove that the measurement method, not only the wiring, is correct.<\/p>\n<h3>3.3 Worked example: voltage drop on a supply line<\/h3>\n<p><em>Example.<\/em> The bench supplies a unit drawing 5 A through 3 m of wire (6 m loop) with 0.0133 \u03a9\/m (about 1.3 mm\u00b2 copper, example). Drop = 5 \u00d7 6 \u00d7 0.0133 \u2248 0.40 V. A 12.0 V setting becomes about 11.6 V at the product. Either sense at the product or account for the drop in the specification.<\/p>\n<h2>4. Instruments and calibration<\/h2>\n<ul>\n<li>Each instrument is identified (model, serial number) in the bench documentation.<\/li>\n<li>Instruments are calibrated by accredited laboratories; RAYNOV works with accredited partner laboratories and does not claim its own accreditation. The general requirements for calibration laboratories are set by ISO\/IEC 17025.<\/li>\n<li>Calibration certificates and due dates are part of the delivery file.<\/li>\n<li>The software checks instrument identity at start-up, so a replaced instrument is detected.<\/li>\n<\/ul>\n<h2>5. Reference units: golden and bad parts<\/h2>\n<h3>5.1 Golden units<\/h3>\n<p>Known good products, characterised independently. The bench must pass them, repeatedly.<\/p>\n<h3>5.2 Known bad units (limit samples)<\/h3>\n<p>Parts or simulators with a known defect for each critical test: an open, a short, a value just outside the limit. The bench must fail each one on the right step, with the right message. Without bad parts, you prove only that the bench can say PASS.<\/p>\n<h3>5.3 Repeatability<\/h3>\n<p>Run the same reference units several times, and by several operators if the process allows it. A gauge repeatability and reproducibility study (gauge R&amp;R) is a common way to quantify this; the acceptance threshold is set in the bench specification. A widely used reference (AIAG MSA manual): below 10 % of the tolerance or process variation, acceptable; 10 to 30 %, may be acceptable depending on the application; above 30 %, not acceptable. The number of distinct categories (ndc \u2265 5) is often checked as well.<\/p>\n<h2>6. Documentation delivered with the bench<\/h2>\n<ul>\n<li>User manual and operator instructions.<\/li>\n<li>Electrical schematics and mechanical drawings.<\/li>\n<li>Wiring lists of the bench harness.<\/li>\n<li>Software version, limit-file version and change history.<\/li>\n<li>Calibration certificates of instruments.<\/li>\n<li>FAT report and SAT report, each signed.<\/li>\n<li>Maintenance plan: wear parts (fixture contacts), recalibration dates.<\/li>\n<\/ul>\n<h2>7. Common mistakes<\/h2>\n<ul>\n<li>FAT without written acceptance criteria.<\/li>\n<li>Testing only with good units.<\/li>\n<li>Skipping SAT because &#8220;FAT passed&#8221;.<\/li>\n<li>Ignoring harness resistance in low-value measurements.<\/li>\n<li>Software that does not log its own version.<\/li>\n<li>Calibration certificates missing at delivery.<\/li>\n<li>Changing the bench after SAT without re-qualifying the affected tests.<\/li>\n<\/ul>\n<h2>8. Qualification checklist<\/h2>\n<ul>\n<li>[ ] Bench test specification and acceptance criteria signed before build.<\/li>\n<li>[ ] Every channel verified for continuity, shorts and assignment.<\/li>\n<li>[ ] Low-resistance and supply-drop effects checked where relevant.<\/li>\n<li>[ ] Instruments identified, calibrated, certificates in the file.<\/li>\n<li>[ ] Golden units pass repeatedly; known bad units fail on the right step.<\/li>\n<li>[ ] Repeatability quantified against the agreed threshold.<\/li>\n<li>[ ] Error handling and safe state verified.<\/li>\n<li>[ ] FAT report signed; deviations closed.<\/li>\n<li>[ ] SAT done in the real environment with trained operators; acceptance report signed.<\/li>\n<li>[ ] Re-qualification rule defined for future changes.<\/li>\n<\/ul>\n<h2>9. Going further<\/h2>\n<p>Qualification links directly to the acceptance logic explained in <a href=\"https:\/\/raynovtechnology.com\/atp-vs-qtp\/\">ATP vs QTP<\/a> and our <a href=\"https:\/\/raynovtechnology.com\/atp-methodology\/\">ATP methodology<\/a>. Two parts of a bench deserve their own checks: <a href=\"https:\/\/raynovtechnology.com\/wire-harness-continuity-insulation-testing\/\">harness continuity and insulation testing<\/a> and <a href=\"https:\/\/raynovtechnology.com\/acquisition-timing-jitter-windows\/\">acquisition timing<\/a>. Software traceability is covered in <a href=\"https:\/\/raynovtechnology.com\/test-automation-script-to-sequencer\/\">test automation: from script to sequencer<\/a>.<\/p>\n<p><strong>External reference:<\/strong> a general overview of <a href=\"https:\/\/en.wikipedia.org\/wiki\/Factory_acceptance_test\">factory acceptance testing<\/a>.<\/p>\n<p>RAYNOV delivers <a href=\"https:\/\/raynovtechnology.com\/custom-validation-system-delivery\/\">custom validation systems<\/a> through FAT, SAT and training, and maintains benches after delivery.<\/p>\n<p><strong>Preparing a FAT or SAT for a new bench? <a href=\"https:\/\/raynovtechnology.com\/contact\/\">Contact our engineers<\/a>.<\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>A new end-of-line bench rejects one unit in ten on its first week. Production stops, the product team reworks parts, [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":2945,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_uag_custom_page_level_css":"","site-sidebar-layout":"default","site-content-layout":"","ast-site-content-layout":"normal-width-container","site-content-style":"unboxed","site-sidebar-style":"default","ast-global-header-display":"","ast-banner-title-visibility":"","ast-main-header-display":"","ast-hfb-above-header-display":"","ast-hfb-below-header-display":"","ast-hfb-mobile-header-display":"","site-post-title":"","ast-breadcrumbs-content":"","ast-featured-img":"","footer-sml-layout":"","ast-disable-related-posts":"","theme-transparent-header-meta":"","adv-header-id-meta":"","stick-header-meta":"","header-above-stick-meta":"","header-main-stick-meta":"","header-below-stick-meta":"","astra-migrate-meta-layouts":"default","ast-page-background-enabled":"default","ast-page-background-meta":{"desktop":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"ast-content-background-meta":{"desktop":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"footnotes":""},"categories":[22],"tags":[],"class_list":["post-2911","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-testing-guides"],"uagb_featured_image_src":{"full":["https:\/\/raynovtechnology.com\/wp-content\/uploads\/2026\/10\/G9-featured-v2.png",1200,675,false],"thumbnail":["https:\/\/raynovtechnology.com\/wp-content\/uploads\/2026\/10\/G9-featured-v2-150x150.png",150,150,true],"medium":["https:\/\/raynovtechnology.com\/wp-content\/uploads\/2026\/10\/G9-featured-v2-300x169.png",300,169,true],"medium_large":["https:\/\/raynovtechnology.com\/wp-content\/uploads\/2026\/10\/G9-featured-v2-768x432.png",768,432,true],"large":["https:\/\/raynovtechnology.com\/wp-content\/uploads\/2026\/10\/G9-featured-v2-1024x576.png",1024,576,true],"1536x1536":["https:\/\/raynovtechnology.com\/wp-content\/uploads\/2026\/10\/G9-featured-v2.png",1200,675,false],"2048x2048":["https:\/\/raynovtechnology.com\/wp-content\/uploads\/2026\/10\/G9-featured-v2.png",1200,675,false],"trp-custom-language-flag":["https:\/\/raynovtechnology.com\/wp-content\/uploads\/2026\/10\/G9-featured-v2-18x10.png",18,10,true]},"uagb_author_info":{"display_name":"Sphie-bot","author_link":"https:\/\/raynovtechnology.com\/fr\/author\/sphie-bot\/"},"uagb_comment_info":0,"uagb_excerpt":"A new end-of-line bench rejects one unit in ten on its first week. Production stops, the product team reworks parts, [&hellip;]","_links":{"self":[{"href":"https:\/\/raynovtechnology.com\/fr\/wp-json\/wp\/v2\/posts\/2911","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/raynovtechnology.com\/fr\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/raynovtechnology.com\/fr\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/raynovtechnology.com\/fr\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/raynovtechnology.com\/fr\/wp-json\/wp\/v2\/comments?post=2911"}],"version-history":[{"count":2,"href":"https:\/\/raynovtechnology.com\/fr\/wp-json\/wp\/v2\/posts\/2911\/revisions"}],"predecessor-version":[{"id":2934,"href":"https:\/\/raynovtechnology.com\/fr\/wp-json\/wp\/v2\/posts\/2911\/revisions\/2934"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/raynovtechnology.com\/fr\/wp-json\/wp\/v2\/media\/2945"}],"wp:attachment":[{"href":"https:\/\/raynovtechnology.com\/fr\/wp-json\/wp\/v2\/media?parent=2911"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/raynovtechnology.com\/fr\/wp-json\/wp\/v2\/categories?post=2911"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/raynovtechnology.com\/fr\/wp-json\/wp\/v2\/tags?post=2911"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}