{"id":2985,"date":"2026-11-04T10:41:56","date_gmt":"2026-11-04T10:41:56","guid":{"rendered":"https:\/\/raynovtechnology.com\/acceptance-test-procedure-template\/"},"modified":"2026-11-04T10:41:56","modified_gmt":"2026-11-04T10:41:56","slug":"acceptance-test-procedure-template","status":"publish","type":"post","link":"https:\/\/raynovtechnology.com\/fr\/acceptance-test-procedure-template\/","title":{"rendered":"R\u00e9diger une proc\u00e9dure d'essai de r\u00e9ception (ATP) : mod\u00e8le et exemple"},"content":{"rendered":"<p><strong>An Acceptance Test Procedure (ATP) is the document that lists, step by step, the tests a delivered system must pass, with the setup, the expected result and a pass\/fail criterion for each test, before the customer signs acceptance. A usable ATP template has seven parts: scope and references, test setup and equipment, prerequisites, numbered test cases with pass\/fail criteria, a results log, non-conformity handling, and a traceability matrix with sign-off.<\/strong><\/p>\n<p>The factory acceptance test is scheduled for Thursday. The bench is wired, the software runs, the customer&#8217;s engineer is booked on a flight. Then someone opens the ATP and finds test case 14: &#8220;Check that the power supply works correctly.&#8221; Nobody agrees on what &#8220;correctly&#8221; means, which instrument to use, or what to do if the reading is borderline. The FAT turns into a negotiation instead of a measurement.<\/p>\n<p>Most acceptance disputes start in the document, not on the bench. This article gives a practical ATP template, a worked test case and a sign-off checklist you can adapt to a HIL bench, a battery validation system, an End-of-Line tester or a harness tester.<\/p>\n<p><em>Note: the seven-part structure below is an editorial proposal from RAYNOV, not a standard.<\/em><\/p>\n<h2>What an ATP document is (and what it is not)<\/h2>\n<h3>ATP vs test plan vs test report<\/h3>\n<p>Three documents are often confused, and a good ATP depends on keeping them apart:<\/p>\n<ul>\n<li>The <strong>acceptance test plan<\/strong> says <em>what<\/em> will be tested, <em>when<\/em>, by <em>whom<\/em> and with <em>which resources<\/em>. It sets scope, schedule and responsibilities.<\/li>\n<li>The <strong>acceptance test procedure<\/strong> says <em>how<\/em>. It describes each test step by step, with the setup, the expected value and the criterion that decides pass or fail.<\/li>\n<li>The <strong>acceptance test report<\/strong> says <em>what was obtained<\/em>. It records the measured values, the verdicts, the deviations and the signatures.<\/li>\n<\/ul>\n<p>The plan can fit on a few pages. The procedure is the working document an operator follows at the bench. The report is the evidence that remains once the unit has shipped.<\/p>\n<h3>When it is written and approved<\/h3>\n<p>The ATP is normally written before the Factory Acceptance Test (FAT) and approved by the customer before any test is executed. Ideally, it is frozen and approved at least a few weeks before the FAT, so that both sides have time to review it and prepare the bench. Approval before execution matters: once criteria are signed, results can be compared against them without debate. If the customer first sees the criteria on the day of the FAT, every borderline result becomes a discussion.<\/p>\n<p>If you need the difference between acceptance and qualification, see <a href=\"https:\/\/raynovtechnology.com\/atp-vs-qtp\/\">ATP vs QTP<\/a>. This article focuses on the acceptance document itself.<\/p>\n<h2>The 7 sections of an ATP template<\/h2>\n<h3>1. Scope, references and revision history<\/h3>\n<p>State which system, which configuration and which revision the ATP covers. List the reference documents: the customer requirements or specification, the drawings and wiring diagrams, the software version, and any applicable contract clauses. Add a revision table (revision, date, author, change, approver). An ATP that does not say which revision of the specification it tests against cannot be signed with confidence.<\/p>\n<h3>2. Test setup and equipment<\/h3>\n<p>List every instrument used: type, model, serial number and calibration status with its due date. Record the test software and its version, the fixtures and the cables. If a measurement depends on a specific accessory (Kelvin probes, a shunt, a load), name it. This section is what lets someone repeat the test six months later and get a comparable result.<\/p>\n<h3>3. Prerequisites and safety<\/h3>\n<p>Describe the conditions that must be true before testing starts: ambient temperature range, supply voltage, warm-up time, the software loaded, the unit in its delivered configuration. Add the safety instructions. For high-voltage systems this means PPE, lockout\/tagout (LOTO) and qualified staff only. A test that runs under the wrong conditions is not a failed test; it is an invalid one, and the ATP should say so.<\/p>\n<h3>4. Test cases<\/h3>\n<p>This is the core of the document. Each test case needs:<\/p>\n<ul>\n<li>a unique <strong>ID<\/strong> (for example ATP-PWR-03);<\/li>\n<li>the <strong>requirement<\/strong> it covers, by reference;<\/li>\n<li>numbered <strong>steps<\/strong>, written so a trained operator can follow them without interpretation;<\/li>\n<li>the <strong>expected value<\/strong> with its <strong>unit<\/strong> and <strong>tolerance<\/strong>;<\/li>\n<li>the <strong>pass\/fail criterion<\/strong>, stated objectively.<\/li>\n<\/ul>\n<p>Group cases by function (power, I\/O, communication, safety, software) so the order of execution follows the logic of the system.<\/p>\n<h3>5. Results log<\/h3>\n<p>For each case, record the measured value, the verdict (pass \/ fail \/ not applicable), the operator, the date and, where useful, the raw data file name. Leave room for comments. A results log with only ticks and no measured values is hard to defend later.<\/p>\n<h3>6. Non-conformities and retest rules<\/h3>\n<p>Define in advance what happens when a test fails: how the non-conformity is recorded, who analyses it, who decides on the fix, and what must be retested afterwards. Say whether a fix requires rerunning only the failed case or a whole group of related cases. Agreeing this before the FAT avoids long discussions during it.<\/p>\n<h3>7. Traceability matrix and sign-off<\/h3>\n<p>The traceability matrix links every requirement to at least one test case and its result. It shows at a glance that nothing has been forgotten. The sign-off page records the final verdict (accepted, accepted with reservations, or rejected), the open non-conformities and the signatures of the supplier and the customer.<\/p>\n<h2>Worked example: one test case for a test bench<\/h2>\n<p>Below is one generic test case in table form. It covers voltage drop on a supply line of a test bench, following the same logic as the qualification checks in our <a href=\"https:\/\/raynovtechnology.com\/test-bench-qualification-fat-sat\/\">test bench qualification guide (FAT\/SAT)<\/a>. The fields refer to the bench specification; the figures in the last row are illustrative only.<\/p>\n<p><em>Example only \u2014 values come from the actual specification.<\/em><\/p>\n<table>\n<thead>\n<tr>\n<th>Field<\/th>\n<th>Content<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>ID<\/td>\n<td>ATP-PWR-03 (example)<\/td>\n<\/tr>\n<tr>\n<td>Requirement<\/td>\n<td>REQ-PWR-xx: voltage at the DUT connector under rated load shall stay within the specified tolerance<\/td>\n<\/tr>\n<tr>\n<td>Setup<\/td>\n<td>Bench powered and warmed up per section 3; electronic load connected at the DUT connector; calibrated DMM (serial and calibration due date recorded in section 2)<\/td>\n<\/tr>\n<tr>\n<td>Steps<\/td>\n<td>1. Set the supply to nominal voltage. 2. Apply rated load current. 3. Wait for the stabilisation time. 4. Measure the voltage directly at the DUT connector pins (sense leads separate from power leads). 5. Record the value.<\/td>\n<\/tr>\n<tr>\n<td>Expected<\/td>\n<td>U_nom (e.g. 24.0 V per specification)<\/td>\n<\/tr>\n<tr>\n<td>Tolerance<\/td>\n<td>\u00b1x % per specification<\/td>\n<\/tr>\n<tr>\n<td>Measured<\/td>\n<td>(filled in during the FAT)<\/td>\n<\/tr>\n<tr>\n<td>Verdict<\/td>\n<td>Pass if the measured value is within tolerance; otherwise open a non-conformity per section 6<\/td>\n<\/tr>\n<tr>\n<td>Illustrative example<\/td>\n<td>24.0 V, tolerance \u22122 % \/ +1 % (example, not from a real project)<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>Every field answers a question the customer&#8217;s engineer would otherwise ask on the day: which requirement, which instrument, which method, which limit.<\/p>\n<h2>Writing pass\/fail criteria that nobody can argue with<\/h2>\n<h3>Measurable, with a unit and a tolerance<\/h3>\n<p>&#8220;Works correctly&#8221; cannot be signed. &#8220;Voltage at J3 between X V and Y V under rated load&#8221; can. For functional checks with no numeric value, state the observable result: &#8220;the emergency stop opens the HV contactor and the HMI displays fault code E-STOP&#8221;. If two people could read the criterion differently, rewrite it.<\/p>\n<h3>Measurement conditions stated<\/h3>\n<p>The same quantity can give different readings depending on how it is measured. State the instrument, the method, the measurement point and the stabilisation time. 4-wire (Kelvin) measurement is mainly used for low resistances, such as harness continuity, shunts and contacts, where lead resistance would otherwise distort the reading. For a voltage under load, say where it is measured: in the example above, directly at the DUT connector pins, with sense leads separate from power leads. Check that the instrument is good enough for the tolerance. A common rule of thumb is a 10:1 ratio between the tolerance and the measurement uncertainty; a 4:1 ratio, associated with ANSI\/NCSL Z540.3, is often accepted in practice.<\/p>\n<p>When a tester will be used for production decisions, as with EOL and harness testers, a gauge R&amp;R study shows whether the measurement system can be trusted. Under the AIAG guidelines, a %GRR under 10 % is acceptable, 10 to 30 % is conditionally acceptable depending on the application, and over 30 % is rejected, with a number of distinct categories (ndc) of 5 or more.<\/p>\n<h3>One requirement, at least one test case<\/h3>\n<p>Every requirement in the specification should map to at least one test case, and every test case should point back to a requirement. Test cases with no requirement are a sign of scope creep; requirements with no test case are gaps that show up after delivery.<\/p>\n<h2>Adapting the template to the system under test<\/h2>\n<p>The seven sections stay the same. What changes is the content of the test cases.<\/p>\n<h3>HIL bench \/ ECU validation<\/h3>\n<p>Test cases cover I\/O channels, signal conditioning, communication buses, real-time model execution, fault injection (open circuit, short to ground or supply) and the automated sequences delivered with the bench. See <a href=\"https:\/\/raynovtechnology.com\/hil-test-bench-architecture\/\">HIL test bench architecture<\/a>.<\/p>\n<h3>Battery and BMS validation systems<\/h3>\n<p>Focus on cell and pack emulation accuracy, current capability, safety functions (emergency stop, interlocks, insulation monitoring), fault injection and communication with the BMS under test. High-voltage safety prerequisites carry more weight here. See <a href=\"https:\/\/raynovtechnology.com\/bms-battery-pack-testing-vs-ecu-validation\/\">BMS and battery pack testing vs ECU validation<\/a>.<\/p>\n<h3>End-of-Line testers<\/h3>\n<p>Add cases for cycle time, result traceability and detection of known-bad reference parts, so the tester proves it does not pass a defective unit or reject a good one. See <a href=\"https:\/\/raynovtechnology.com\/eol-test-cycle-time-reduction\/\">EOL test cycle time reduction<\/a>.<\/p>\n<h3>Wire harness testers<\/h3>\n<p>Cover continuity, insulation, connector keying and locking checks, and detection of known defects on reference harnesses. See <a href=\"https:\/\/raynovtechnology.com\/wire-harness-continuity-insulation-testing\/\">wire harness continuity and insulation testing<\/a>.<\/p>\n<h2>ATP sign-off checklist<\/h2>\n<p>Before you sign, check that:<\/p>\n<ul>\n<li>[ ] Scope, system revision and reference documents are stated.<\/li>\n<li>[ ] Every instrument is listed with serial number and valid calibration.<\/li>\n<li>[ ] Software and firmware versions are recorded.<\/li>\n<li>[ ] Prerequisites and safety instructions were met and noted.<\/li>\n<li>[ ] Every test case has an ID, a requirement, steps, an expected value and a tolerance.<\/li>\n<li>[ ] Every result has a measured value, a verdict, an operator and a date.<\/li>\n<li>[ ] Every non-conformity is recorded, with its fix and retest.<\/li>\n<li>[ ] The traceability matrix shows no requirement without a test case.<\/li>\n<li>[ ] The final verdict is stated: accepted, accepted with reservations, or rejected.<\/li>\n<li>[ ] Supplier and customer signatures are on the sign-off page.<\/li>\n<\/ul>\n<h2>How RAYNOV delivers the ATP with every system<\/h2>\n<p>RAYNOV designs test benches and validation systems that can be delivered with their ATP, traceability matrix and acceptance reports. The approach follows six stages: requirements, test planning, test development, test execution, issue resolution and final acceptance, with tests based on requirements and documented at each stage. See our <a href=\"https:\/\/raynovtechnology.com\/atp-methodology\/\">ATP methodology<\/a> and how we approach <a href=\"https:\/\/raynovtechnology.com\/custom-validation-system-delivery\/\">custom validation system delivery<\/a>.<\/p>\n<h2>FAQ<\/h2>\n<p><strong>What is the difference between an acceptance test plan and an acceptance test procedure?<\/strong>\nThe plan sets the scope, schedule, responsibilities and resources for acceptance. The procedure describes each test step by step, with its setup, expected result and pass\/fail criterion.<\/p>\n<p><strong>Who writes the ATP, the supplier or the customer?<\/strong>\nOften the supplier writes it from the customer&#8217;s requirements, and the customer reviews and approves it before execution.<\/p>\n<p><strong>What should an acceptance test report include?<\/strong>\nThe configuration tested, the result and verdict of each test case, the deviations and how they were handled, the traceability matrix and the signatures.<\/p>\n<p><strong>Is there a standard for test documentation?<\/strong>\nISO\/IEC\/IEEE 29119-3 (first edition 2013, revised 2021) replaced IEEE 829-2008. It comes mainly from software testing; hardware test systems also rely on sector and customer requirements.<\/p>\n<p><strong>Can the same ATP be used for FAT and SAT?<\/strong>\nOften yes. The same base document is used, and the SAT repeats a subset of tests defined in the ATP: checks after transport, on-site integration and the customer interfaces. See our <a href=\"https:\/\/raynovtechnology.com\/test-bench-qualification-fat-sat\/\">FAT\/SAT qualification guide<\/a>.<\/p>\n<h2>Need a test bench delivered with its ATP and traceability matrix?<\/h2>\n<p>Tell us about your system under test and your acceptance requirements. <strong><a href=\"https:\/\/raynovtechnology.com\/quote-page\/\">Request a quote<\/a><\/strong> \u00b7 or read our <a href=\"https:\/\/raynovtechnology.com\/atp-methodology\/\">ATP methodology<\/a>.<\/p>\n\n<script type=\"application\/ld+json\">\n{\n  \"@context\": \"https:\/\/schema.org\",\n  \"@type\": \"FAQPage\",\n  \"mainEntity\": [\n    {\n      \"@type\": \"Question\",\n      \"name\": \"What is the difference between an acceptance test plan and an acceptance test procedure?\",\n      \"acceptedAnswer\": {\n        \"@type\": \"Answer\",\n        \"text\": \"The plan sets the scope, schedule, responsibilities and resources for acceptance. The procedure describes each test step by step, with its setup, expected result and pass\/fail criterion.\"\n      }\n    },\n    {\n      \"@type\": \"Question\",\n      \"name\": \"Who writes the ATP, the supplier or the customer?\",\n      \"acceptedAnswer\": {\n        \"@type\": \"Answer\",\n        \"text\": \"Often the supplier writes it from the customer's requirements, and the customer reviews and approves it before execution.\"\n      }\n    },\n    {\n      \"@type\": \"Question\",\n      \"name\": \"What should an acceptance test report include?\",\n      \"acceptedAnswer\": {\n        \"@type\": \"Answer\",\n        \"text\": \"The configuration tested, the result and verdict of each test case, the deviations and how they were handled, the traceability matrix and the signatures.\"\n      }\n    },\n    {\n      \"@type\": \"Question\",\n      \"name\": \"Is there a standard for test documentation?\",\n      \"acceptedAnswer\": {\n        \"@type\": \"Answer\",\n        \"text\": \"ISO\/IEC\/IEEE 29119-3 (first edition 2013, revised 2021) replaced IEEE 829-2008. It comes mainly from software testing; hardware test systems also rely on sector and customer requirements.\"\n      }\n    },\n    {\n      \"@type\": \"Question\",\n      \"name\": \"Can the same ATP be used for FAT and SAT?\",\n      \"acceptedAnswer\": {\n        \"@type\": \"Answer\",\n        \"text\": \"Often yes. The same base document is used, and the SAT repeats a subset of tests defined in the ATP: checks after transport, on-site integration and the customer interfaces.\"\n      }\n    }\n  ],\n  \"inLanguage\": \"en\"\n}\n<\/script>\n\n","protected":false},"excerpt":{"rendered":"<p>How to write an Acceptance Test Procedure for a test bench: the 7 sections of an ATP template, a worked test case example and a sign-off checklist.<\/p>","protected":false},"author":2,"featured_media":2947,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_uag_custom_page_level_css":"","site-sidebar-layout":"default","site-content-layout":"","ast-site-content-layout":"default","site-content-style":"default","site-sidebar-style":"default","ast-global-header-display":"","ast-banner-title-visibility":"","ast-main-header-display":"","ast-hfb-above-header-display":"","ast-hfb-below-header-display":"","ast-hfb-mobile-header-display":"","site-post-title":"","ast-breadcrumbs-content":"","ast-featured-img":"","footer-sml-layout":"","ast-disable-related-posts":"","theme-transparent-header-meta":"","adv-header-id-meta":"","stick-header-meta":"","header-above-stick-meta":"","header-main-stick-meta":"","header-below-stick-meta":"","astra-migrate-meta-layouts":"default","ast-page-background-enabled":"default","ast-page-background-meta":{"desktop":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"ast-content-background-meta":{"desktop":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"footnotes":""},"categories":[21],"tags":[],"class_list":["post-2985","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-validation-methods"],"uagb_featured_image_src":{"full":["https:\/\/raynovtechnology.com\/wp-content\/uploads\/2026\/10\/raynov-mini-hil-3.png",1920,1080,false],"thumbnail":["https:\/\/raynovtechnology.com\/wp-content\/uploads\/2026\/10\/raynov-mini-hil-3-150x150.png",150,150,true],"medium":["https:\/\/raynovtechnology.com\/wp-content\/uploads\/2026\/10\/raynov-mini-hil-3-300x169.png",300,169,true],"medium_large":["https:\/\/raynovtechnology.com\/wp-content\/uploads\/2026\/10\/raynov-mini-hil-3-768x432.png",768,432,true],"large":["https:\/\/raynovtechnology.com\/wp-content\/uploads\/2026\/10\/raynov-mini-hil-3-1024x576.png",1024,576,true],"1536x1536":["https:\/\/raynovtechnology.com\/wp-content\/uploads\/2026\/10\/raynov-mini-hil-3-1536x864.png",1536,864,true],"2048x2048":["https:\/\/raynovtechnology.com\/wp-content\/uploads\/2026\/10\/raynov-mini-hil-3.png",1920,1080,false],"trp-custom-language-flag":["https:\/\/raynovtechnology.com\/wp-content\/uploads\/2026\/10\/raynov-mini-hil-3-18x10.png",18,10,true]},"uagb_author_info":{"display_name":"Sphie-bot","author_link":"https:\/\/raynovtechnology.com\/fr\/author\/sphie-bot\/"},"uagb_comment_info":1,"uagb_excerpt":"How to write an Acceptance Test Procedure for a test bench: the 7 sections of an ATP template, a worked test case example and a sign-off checklist.","_links":{"self":[{"href":"https:\/\/raynovtechnology.com\/fr\/wp-json\/wp\/v2\/posts\/2985","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/raynovtechnology.com\/fr\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/raynovtechnology.com\/fr\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/raynovtechnology.com\/fr\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/raynovtechnology.com\/fr\/wp-json\/wp\/v2\/comments?post=2985"}],"version-history":[{"count":0,"href":"https:\/\/raynovtechnology.com\/fr\/wp-json\/wp\/v2\/posts\/2985\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/raynovtechnology.com\/fr\/wp-json\/wp\/v2\/media\/2947"}],"wp:attachment":[{"href":"https:\/\/raynovtechnology.com\/fr\/wp-json\/wp\/v2\/media?parent=2985"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/raynovtechnology.com\/fr\/wp-json\/wp\/v2\/categories?post=2985"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/raynovtechnology.com\/fr\/wp-json\/wp\/v2\/tags?post=2985"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}